Our Projects

Our Projects

S.NO Project Title Client SCOPE OF WORK YEAR TOTAL JOB VALUE (DHS & $) Gallery
1 A-16426.1 AADC Installation of 33, 11 & 0.415 KV Cables, Equipment’s & Distribution Transformers (11/0.415KV) in Al Ain & Regions (Lot no .1). 2019-2020
2 Project 5273 GASCO 132kV Cable Laying Works ,Power Interconnection Project in Habshan-5  2015 615,700
3 Contract No. 4351400030 DEWA Installation of LV Cables, Distribution, Boards & Drilling 2014 1,500,463.73
4 Contract No.T-12/2013 ADM Installation/Maintenance/ Replacement of Street Lighting Pole, Laterns, Equipment Bridges, Tunnels, Underpasses, Pedestrian And Associated Facilities Abu Dhabi City- Sectors Western. 2013 9,900,000.00
5 Contract No.4351300016 DEWA Installation of 11 KV Overhead Lines 2013 1,262,390.12
6 Contract No. 4400476495 Raytheon Installation Work for Communication of 15M Tower  in U.A.E 2013 $ 384,150.00
7 Contract No.4351300012 DEWA Drilling Across The Roads Cable Laying 2013 1,274,259.80
8 Contract No. A-10481.1 AADC Installation of MV/LV Cables, Equipments and Digital Energy Meters 2012 16,229,549.70
9 Contract No. Shams 01 INABENSA Installation & Commissioning of 220/11 KV Cable Laying & Fiber Optic Cable (FOC) 2012 1,891,100.00
10 Contract No. 4281200004 DEWA Installation of 11 KV Overhead Lines on Wooden Poles and Dismantling & Recovery of Existing 33 KV/11 KV Overhead Lines 2012 1,979,598.00
11 Contract No. 4400441533 Raytheon Installation Work for Communication Tower at Different Location in U.A.E 2012 $1,155,525.00
12 Contract No. N-6524 TRANSCO 400 KV Cable Works Between SAS AL NAKHEEL MAHAWI AND MUSSAFAH 2011 7,390,000.00
13 Contract No. CE/0126/2011 DEWA Installation of Low Voltage Cables Drilling Under the Roads & Installation of Mini Distribution Pillars 2011 3,850,733.00
14 Contract No. CE/0491B/2010 DEWA Installation And Commissioning of 11 KV Cables 2011 17,977,732.88
15 Contract No. EWC4 ADDC 11 KV Cabling Works from Substation E40 Arzanah Development at Zayed Sports City 2011 9,497,786.00
16 Contract No. CE/0312B/2010 DEWA Installation of 11 KV Overhead Lines on Wooden Poles and Dismantling & Recovery of Existing 33 KV/11 KV Overhead Lines 2011 2,388,036.00
17 Contract No. D-10170/1 ADDC Long Term Agreement Contract for Street Light Lamps Replacement Poles and others for Western Region 2010 3,499,400.00
18 Contract No. MW-AF-176-2008 G.H.Q Supply & Installation of 80 Meter Tower & Association Works 2010 5,900,000.00
19 Contract No. D-9587 ADDC Replacement of Old Feeder Pillars, Service Turrets and Old Aluminum Low Voltage Cable in Eastern Region, Abu Dhabi 2010 13,345,803.73
20 Contract No. D-9216 ADDC Load Transfer to New 132/11kv Primary E40 Abu Dhabi Island 2010 2,600,000.00
21 Contract No. CE/466/2009 DEWA Installation of 11KV Overhead Lines on wooden Poles and Dismantling & Recovery of Existing 33KV Overhead Lines in Dubai 2010 2,229,363.00
22 Contract No. CE/0187/2010 DEWA Installation of 11KV Overhead Lines on wooden Poles and Dismantling & Recovery of Existing 33KV Overhead Lines in Dubai 2010 998,725.00
23 Contract No. CE/0373/2008 DEWA Installation of 11 kV Overhead Lines on Wooden Poles and Dismantling & Recovery of Existing 33 kV /11kV Over 2010 2,904,159.37
24 Contract No. A-5377.1 AADC Installation of LV Cables (including of F.P’s & S. T’s) 2009 32,231,265.00
25 Contract No. N 6312 TRANSCO 33 kV Underground Cables Installation for Khor Khwair Industries 2008 138,033,622.06
26 Contract No. D 9052 ADDC Installation of Underground Cables Electrical Distribution Equipments and allied work in Abu Dhabi Central Region 2008 4,237,884.00
27 Contract No. D – 7684 ADDC Supply and Install fuse switch Rail Covers & Modifying the fuse rail 2008 2,013,178.32
28 Contract No. A – 3772 AADC Installation of 11 kv Cables (New Development) – Lot 2 2008 3,961,100
29 Contract No. D-7760 ADDC Installation of U/G LV Cables, Electrical Distribution Equipments and Allied Works in Abu Dhabi Eastern Region. 2007 9,808,904.00
30 Contract No. D-7967/A ADDC Supply and Installation of Electrical Distribution Equipments, Underground Cables & Accessories For Power Connection, Network Reinforcement / Expansion, Relocation, Emergency and VIP Works in Eastern Region, Abu Dhabi 2007 10,000,000
31 Contract No. D-4950 ADWEA 11kV Load Transfer from Existing W16 to New W16 Primary 2006 7,783,758
32 Contract No. D-4139 ADDC Rehabilitation, Preventive and Corrective Maintenance for 11/33kV OHL. Adding a new B.O.Q Items for Trimming or Cutting trees, adjacent to ADDC Over Head Transmission. 2005 3,284,000
33 Contract No. A-2889 AADC Installation of 11kV Cables (Reinforcement)  2005 1,396,586
34 Contract No. A-2887 AADC Installation of 11kV Cables (New Development) – Lot 1 2005 2,754,850
35 Contract No.D-3701 ADWEA Supply & Installation of Distribution Equipment and Cable Allied Works in Musaffah East. 2005 16,004,070
36 Contract No.D-4655 ADWEA Rehabilitation and Reinforcement of HV & LV Network at Old Shahama, Rahba abd Khalifa City B 2005 5,680,646
37 Contract No.-A 2350 ADWEA Installation of 11 kV Cables (New Development). 2005 3,170,767
38 Contract No. A-2043 AADC Development – Lot 3. 2004 2,087,727
39 Contract No. A-1815 ADWEA Installation of 33kV Power & Pilot Cables with Accessories in Al Ain Area 2004 4,560,750
40 Contract No. D-2353 ADDC Installation of Cables, Distribution Equipment & Overhead lines to feed Khalifa “A” Farms. 2003 772,400
41 Contract No. D-2864 ADDC Installation of 11kV Cables for power supply to Shati-Al Raha Resort and GAMCO & Amiri Flight. 2003 1,499,786
42 Contract No.G-1535 ADWEA Low voltage equipment, LV Cables, Street Lighting and Fire Detection system in Mina Zayed 2003 8,544,920
43 Contract No. A-1022 AADC Installation of 33kV Power Cables and Pilot Cables in Al Ain area. 2003 4,666,067
44 Contract No.A-01-0089 AADC Installation of 33/11kV 15MVA & 10MVA Package Substation at Al Ain. 2003 2,844,100
45 Contract No.B-1059 AADC Building maintenance & Refurbishment of Administration Block at Al Ain Power Station. 2002 357,011
46 Contract No. G-1078 ADWEA Expansion & Augmentation of 11KV network at GIC area & transfer of load on M40 Primary at Musaffah. 2002 3,191,500
47 Contract No. D-00-0116 ADWEA Transfer of Load on E-48 Salt & Chlorine 132/11 KV Primary. 2001 1,212,500
48 Contract No. D-01-8053 ADDC Supply & Installation of Feeder Pillars & Service Turrets to replace old ones in Abu Dhabi island. 2002 987,442
49 Contract No.N-01-0052 ADWEA Civil Maintenance Works for 132/220/400kV Substations.  2001 1,494,953
50 Contract No. D-00-0135 ADWEA Transfer of Load on E 25 Primary in Abu Dhabi 2001 1,759,500
51 Contract No. D-01-0090 ADWEA Development of Distribution Network to supply power to 390 Houses at Bahya & Al Rahba. 2001 3,452,125
52 Contract No.D-00-0010 ADWEA Expansion and reinforcement of 33KV, 11KV and LV Distribution Networks for Al Wathba new camel Race area. 2000/ 2001 17,099,945
53 Contract No. D-99-0182 ADWEA Supply & Installation of 33/11 KV Over-head Transmission lines, HV & LV Cables for Feeding New Farma at Liwa & Madinat Zayed. 2000 16,721,430
54 Contract No. WED/S-INST/PD/224 WED Supply & Erection of 33 KV & 400kV Double Circuit Over head Transmission Line, Interconnection/Stringing of Power Network Lot-1A in UAE. 1999 2,500,000
55 Contract No. WED/PD/INST/892 WED Erection of 220KV, Quad Circuit Overhead Transmission Line Towers Musafah to UAN-AI Wathab Junction. 1999 3,000,000
56 Contract No. WED/PD/INST/202 WED Erection & Painting of 220 & 400 KV Over Head Transmission of Line at Mirfa to Ruwais. 1998 2,700,000
57 Contract No. WED/PD/S-INST-798 WED 220 KV Installations of Overhead Transmission Lines in Mussafa and Baniyas Area. 1996 2,043,270
58 Contract No. WED/PD/S-INST-798 WED 220 KV Installations of Overhead Transmission Lines in Mussafa and Baniyas Area. 1996 2,043,270
59 Contract No. WED/PD/724 WED Concrete Foundation Legs of more 2000 nos. Overhead Transmission Line Towers 33, 132, & 220KV in UAE. 1995 11,000,000
60 Contract No. WED/PD-VS/INS-172 WED Erection, Maintenance & Painting of 220 & 400KV OHL at Madinaa Zayed to Liwa. 1994 900,000
61 Contract No. WED/PD/OHTL-667 WED Construction of Foundation, Erection & Painting of 400 KV Over Head Transmission Line at Taweelah to Al Ain. 1994 1,500,786
62 Contract No. WED/PD/OHTL-644 WED Erection & Painting, Sand Blasting 220 & 400 KV Over Head Transmission Line at Taweelah to Al Ain. 1993 2,500,000

Major Activities

Photo Gallery

Quick Contact Us

Time Electro & Contracting Co. PO Box: 70148 - Abu Dhabi, U.A.E. Abu Dhabi, U.A.E

+971 2 6788621

+971 2 6783085

aziz@emirates.net.ae / aziz@timeelectro.ae

Design And Developed By:Tornado